Initium | Design | Build | Contract

Case Studies

Case Study 1 – 2 Finch Lane

BRIEF – Initium create an extensive transformation refurbishment of a period office building in the heart of The City of London. LOCATION – 2 Finch Lane, London SCALE – 9,000 SQFT BUDGET – £1,000,000 TIMESCALES – 7 months This project involved an initial amount of demolition and structural work that included the removal of existing […]

Case Study Three – 160 Fleet Street

BRIEF – Initium delivered the full refurbishment of one of Fleet Street’s historical buildings to create outstanding serviced offices. LOCATION – 154 – 160 Fleet Street, London SCALE – 60,000 SQFT BUDGET – £11,000,000 TIMESCALES – 16 months Initium was awarded the project to deliver their largest project to that date at 160 Fleet Street. […]

Case Study Two – 150 Minories

BRIEF – Initium deliver a two stage refurbishment of a large office building at the north end of Minories in The City of London. LOCATION – 150 Minories, London SCALE – 70,000 SQFT BUDGET – £7,000,000 TIMESCALES – 11 months A major design and build project to transform a 70,000 sq ft building in Minories […]